Test timeout nop bomb #2

Open
willemtsade wants to merge 6 commits from test_ci_fail_hang into master
Owner

Tests a hanging process in openMSX which should be terminated by a timeout from fail_after.tcl set by omsxctl.

Correct output should look like; (after ~2 minutes)

MSX⁴ ####### BEFORE @@test
MSX⁴ FOLDER CREATE: bin/example/_work/_assert_test/hello-macro80/check-m80
MSX⁴ GEM⁴ TROOPERS: 1
MSX⁴ WRITE BOOSTER: bin/example/_work/_assert_test/hello-macro80/check-m80
MSX⁴ BOOT! OPENMSX: bin/example/hello-macro80/@assert/@test/@check-m80 - Philips_NMS_8250
make: *** [src/example/hello-macro80/0module000.mk:8: bin/example/hello-macro80/@assert/@test/@check-m80] Error 1
⚙️ [runner]: RUN exit status 2
Tests a hanging process in openMSX which should be terminated by a timeout from fail_after.tcl set by omsxctl. Correct output should look like; (after ~2 minutes) ``` MSX⁴ ####### BEFORE @@test MSX⁴ FOLDER CREATE: bin/example/_work/_assert_test/hello-macro80/check-m80 MSX⁴ GEM⁴ TROOPERS: 1 MSX⁴ WRITE BOOSTER: bin/example/_work/_assert_test/hello-macro80/check-m80 MSX⁴ BOOT! OPENMSX: bin/example/hello-macro80/@assert/@test/@check-m80 - Philips_NMS_8250 make: *** [src/example/hello-macro80/0module000.mk:8: bin/example/hello-macro80/@assert/@test/@check-m80] Error 1 ⚙️ [runner]: RUN exit status 2 ```
Test ci timeout nop bomb hang.
Some checks failed
Run test asserts / Test-Asserts (pull_request) Failing after 2m4s
7da08eb10d
Merge branch 'master' into test_ci_fail_hang
Some checks failed
Run test asserts / Test-Asserts (pull_request) Failing after 2m4s
6353df9494
Merge branch 'master' into test_ci_fail_hang
Some checks failed
Run test asserts / Test-Asserts (pull_request) Failing after 2m3s
8e143d30fd
Merge branch 'master' into test_ci_fail_hang
Some checks failed
Run test asserts / Test-Asserts (pull_request) Failing after 2m3s
a883c3ecb7
willemtsade changed title from Test ci timeout nop bomb hang. to Test timeout nop bomb hang. 2024-06-24 12:09:56 +00:00
willemtsade changed title from Test timeout nop bomb hang. to Test timeout nop bomb 2024-06-24 12:10:10 +00:00
Test ci timeout nop bomb hang v2
Some checks failed
Run test asserts / Test-Asserts (pull_request) Failing after 1m49s
00b734bb79
Some checks failed
Run test asserts / Test-Asserts (pull_request) Failing after 1m49s
This pull request can be merged automatically.
This branch is out-of-date with the base branch
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin test_ci_fail_hang:test_ci_fail_hang
git switch test_ci_fail_hang

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch master
git merge --no-ff test_ci_fail_hang
git switch test_ci_fail_hang
git rebase master
git switch master
git merge --ff-only test_ci_fail_hang
git switch test_ci_fail_hang
git rebase master
git switch master
git merge --no-ff test_ci_fail_hang
git switch master
git merge --squash test_ci_fail_hang
git switch master
git merge --ff-only test_ci_fail_hang
git switch master
git merge test_ci_fail_hang
git push origin master
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
arch-msx/msxbuild!2
No description provided.